Get the 2026 AI Integration Pitch Deck (Healthcare & Fintech)
Mobile App Development

Realtime location tracking using Firebase

Location and Geolocator

Saigon Technology specializes in advanced mobile app development. We focus on real-time location tracking with Firebase.

Our mobile apps use Firebase’s database to show live user locations. This supports asset tracking and staff monitoring. It supports location services as well. We ensure a secure and scalable environment.

Share
Overview Image

What The Client Required

Our client had issues with slow app onboarding and old security methods. We used Firebase's tools to speed up sign-ups. We included secure login options like Google sign-in as well. This change boosted user activity and made the app safer.

  • Tracking device location real-time.
  • Share driver location to other users.
  • Show real time line position in the user map when the driver is riding.

Our Technologies

This project was developed by the Saigon Technology team using the following technologies:

  • Firebase store
  • Firebase Authentication
  • Location and Geolocator
  • Google Map API
  • Google direction
  • Google Place

Challenges

  • Real-time Location Sharing: Track user location in live mode. This would work even when the app runs in the background. This allows for continuous monitoring and location updates.
  • Optimized Route Navigation: Plot optimized routes between two points. We would consider factors beyond a straight line. This ensures delivery personnel take the most efficient paths.
  • Live Map Tracking: Display the driver's real-time position on a live map. The app would provide a clear visual image of their location during deliveries.
  • Destination Focus: Locate the map camera with ease. Then, focus it on the designated destination point. This would streamline navigation and task completion.
Challenges Image
Solutions Image

Solutions

  • Background Location Tracking: A background service ensures continuous location updates. This happens even when the app minimizes or closes.
  • Real-time Location Sharing: Firebase Firestore enables real-time data exchange. It allows drivers and dispatchers to track delivery progress.
  • Optimized Route Planning: The app uses Google Maps. It links origin and destination addresses. These integrate with Google Directions. This generates efficient delivery routes.
  • Precise Location Information: Google Places API improves delivery point details. It shows the location and name of the shipper's address.

Related Projects

AI and ML
Optical Character Recognition Document

Optical Character Recognition Document

Every day, a vast quantity of textual information is written or printed on tangible paper, such as study-related messages, invoices, periodicals, books, ads, and so on. Paper contamination is a major issue in the corporate world and has obvious environmental consequences.
Detail arrow
Business
ARB AUSTRALIA

ARB AUSTRALIA

The client requested a browser-based and scan gun-compatible software be developed for usage in the warehouse.
Detail arrow
Business
AWC

AWC

Mobile Team Manager is an online management project to schedule jobs and control resources.
Detail arrow
Mobile App
BIKE TO WORK

BIKE TO WORK

Bike To Work is a GPS fitness-tracking app for iOS and Android ...
Detail arrow
Mobile App
CHILIPLAY

CHILIPLAY

Engagement model: fixed price and ongoing support.
Detail arrow
Business
COST MODULE

COST MODULE

Cost Module allows dealers to set prices, fees, and extra features for each window project, as well as communicate with customers and take orders. Using the resources given by the Cost Module.
Detail arrow
Business
CYCLE OF CHANGE

CYCLE OF CHANGE

The customer still wasn’t clear about the requirement, we had to help them to clarify.
Detail arrow
Business
Facilitation Tool

Facilitation Tool

This case study focuses on the web development of an advanced online graphic editing application for a respected Australian client. The software had several cutting-edge capabilities, such as instantaneous synchronization, full support for Amazon Web Services (AWS), and a serverless design.
Detail arrow
Business
HANDHELD APP

HANDHELD APP

The handheld app for Apple iPhone, iPod, and iPad devices has been developed by Idealpos to enhance customer service provided by staff. Providing users with advanced functionalities to place their own orders, this application is a convenient time-saving tool that can be carried in their pocket.
Detail arrow

See What We'd Build with AI

From demo and architecture to compliance, our engineers guide every step. Let's talk about your project.

    Contact Message Box

    Schedule a Demo with Our Industry Experts

    Book a free 30-minute call

    • See case studies aligned with your requirements
    • Validate our industry experience
    • Confirm technical fit for your project
    Schedule a Demo

      Your RFP, reviewed by experts in 24 hours

      AI-accelerated path from brief to working prototype. Engineers, not sales.
      • Clickable prototype of your core user flow
      • Workflow visualization mapping the full system
      • Architecture direction covering stack, integrations, and scale
      • Technical recommendation call with our engineering team
      Free Demo Campaign